Motoman Robots Arc Welding Boom-Lift Grames for Off-Road Vehicles

Heavy-deposition GMAW welding system includes dual Motoman SK16 robots with a single MRC controller.

Summary

Cycle time 1.5 hours per part. Motoman's robotic solution provides a nearly 80% time savings, plus labor savings over manual welding that requires one welder six to seven hours.

Project Challenges

Motoman Robotics Solution

Motoman Robotics provided a flexible welding solution, including:

Fixtures/Tooling Details

Motoman Robotics provided the holding fixtures on the HS/TS faceplates used to locate the frames on the positioner. Length of spanners between faceplates is adjustable to accommodate various frame sizes.

Go to Home
Google+FacebookYouTubeTwitterLinkedIn